Qurayyah Seawater Supply

Saudi Aramco

Qurayyah Seawater Supply

Scope

  • Project Management
  • Engineering
  • Procurement
  • Construction Management


Facilities

  • 115 miles, 56 -inch and 60-inch seawater pipelines
  • Installation of 17.5 miles of 14-inch fuel gas supply pipeline and reconditioning 27 miles of 24-inch fuel gas pipeline
  • Looping 27 miles of the high pressure injection system
Gulf played a key role in the program management team for Saudi Arabian Oil Company's southern area. The ongoing Southern Area Pipeline Projects program is a multi-task, multi-year endeavor designed to meet increasing area requirements. Gulf's initial assignment was to provide engineering, procurement assistance and construction management for an expansion of enhanced oil recovery (EOR) capabilities.

The expansion projects supply treated seawater required to meet the 1990-2000 Saudi Aramco crude oil demand. The new system meets a designed maximum seawater flow rate of 6 MMBPD. The total capacity was designed to ultimately meet seawater requirements for the Uthmaniyah, Hawiyah and Haradh fields.

Gulf's initial efforts for its client, Saudi Aramco Oil Company, increased the EOR system's injection water capacity through the addition for water supply lines, high pressure injection lines, fuel gas pipelines and the expansion and construction of associated support facilities.

 

Gulf played a key role in the program management team for Saudi Arabian Oil Company’s southern area. The ongoing Southern Area Pipeline Projects program is a multi-task, multi-year endeavor designed to meet increasing area requirements. Gulf’s initial assignment was to provide engineering, procurement assistance and construction management for an expansion of enhanced oil recovery (EOR) capabilities.

 

The expansion projects supply treated seawater required to meet the 1990-2000 Saudi Aramco crude oil demand. The new system meets a designed maximum seawater flow rate of 6 MMBPD. The total capacity was designed to ultimately meet seawater requirements for the Uthmaniyah, Hawiyah and Haradh fields.

 

Gulf’s initial efforts for its client, Saudi Aramco Oil Company, increased the EOR system’s injection water capacity through the addition for water supply lines, high pressure injection lines, fuel gas pipelines and the expansion and construction of associated support facilities.

Additional information